Skip to main content

APEC 2027 & Vietnam Ferry Fleets

Le Quoc KhoiLe Quoc KhoiCEO, Ferry VN JSC
· 8 min read
View as Markdown
Phu Quoc APEC 2027 & Vietnam Ferry Fleets — Ferry VN

Key Takeaways: Verified Phu Quoc tourism statistics confirm over 8.57 million combined air-and-sea arrivals across January–September 2026 — including 1.92M+ foreign entries (+60.2% YoY) — lifting maritime demand ahead of APEC 2027. Ferry VN JSC tracks Vietnam's 15+ active ferry, Ro-Ro, and river carriers so OTAs source verified sailings cleanly.

  • APEC 2027 Demand Trajectory: Phu Quoc expanded from roughly 8.3 million guests across full-year 2025 past 8.57 million in nine months of 2026 (~VND 45,976 billion tourism receipts), driving island spillover nationwide.
  • Three-Tier Fleet Structure: Superdong (16 monohulls) and Phu Quoc Express (eleven ships spanning 223–598 seat twin-hull catamarans alongside its flagship 1,017-passenger monohull Tau Thang Long) anchor automated e-ticketing beside Thanh Thoi and Binh An Ro-Ro vehicle fleets and corridor specialists.
  • 2025–2026 Operational Changes: Mai Linh Express ended Can Tho–Con Dao service in May 2025, Lightning 68 dropped Rach Gia–Phu Quoc in July 2026, Phu Quoc Express sidelined Vung Tau–Con Dao starting August 1, 2026 (slated to resume January 2027), and Phu Quy Express paused HCMC–Con Dao from September 1, 2026 (targeting January 2027).
  • Post-July 2025 Boundaries: Every mainland pier gateway conforms to National Assembly Resolution 202/2025/QH15 across An Giang, Ho Chi Minh City, Can Tho, Lam Dong, and Quang Ngai.

Tracking Phu Quoc tourism statistics in 2026 equips APAC Online Travel Agencies (OTAs), Destination Management Companies (DMCs), and hospitality investors with an early demand benchmark ahead of APEC 2027. Accelerating foreign arrivals tighten domestic air seat pools, spur Mekong-to-island overland routing, and push leisure overflow toward Con Dao, Phu Quy, Nam Du, and Hon Son.

Legacy English directories frequently retain closed lines, obsolete provinces, and misclassified hulls across coastal terminals. Below is the verified 2025–2026 arrival dataset paired with a carrier-by-carrier operational audit of Vietnam's 15+ active fleets verified November 2026.

Phu Quoc Tourism Statistics (2025–2026) and the APEC 2027 Demand Wave

Provincial tourism disclosures compiled via the Vietnam National Authority of Tourism show Phu Quoc scaling from ~8.3 million guests in 2025 (~1.9M foreign) to more than 8.57 million arrivals during January–September 2026 (+30.5% YoY), lifting tourism receipts near VND 45,976 billion as foreign entries jumped 60.2% past 1.92 million. Official municipal figures count combined air-and-sea arrivals across aircraft, high-speed vessels, and vehicle ferries rather than sea passengers alone, yet Rach Gia terminal dispatches 30+ daily sailings whenever peak airfares climb.

Island Destination (Updated Borders) 2025–2026 Volume Benchmark Foreign & Growth Signal Active Mainland Port Gateway B2B Sourcing Significance
Phu Quoc (Special Zone, An Giang) 8.3M full-year 2025, 8.57M+ Jan–Sep 2026 (+30.5% YoY) 1.92M+ foreign entries (+60.2% YoY), APEC 2027 host Rach Gia & Ha Tien piers (An Giang) Deepest daily sailing cadence combining fast craft and vehicle ferries
Con Dao (Special Zone, Ho Chi Minh City) 612,000+ visitors, VND 3,063B+ receipts (2025) High-spend eco-resort & heritage FIT/DMC traffic Tran De (Can Tho), Vung Tau & Nha Rong Khanh Hoi Port (Xom Chieu Ward, HCMC) Fast vessels relieve narrow short-runway flight supply
Phu Quy (Special Zone, Lam Dong) 155,000 (2025), 41,700+ Q1 2026, 173k 2026 goal 2,100+ foreign guests recorded during Q1 2026 Phan Thiet pier (Lam Dong) Lacks any commercial airport, near-total sea reliance
Ly Son (Special Zone, Quang Ngai) Municipal plan sets 400,000 guest target by 2030 Targets 10,000 foreign entries under 2030 roadmap Sa Ky Port, Dong Son (Quang Ngai) Airport-free heritage island serving central Vietnam circuits
Nam Du & Hon Son (Kien Hai, An Giang) Rapidly expanding Kien Hai archipelago demand Domestic long-weekend & multi-island hoppers Rach Gia pier (An Giang) Shares An Giang gateway infrastructure with Phu Quoc

For industry margin modeling, examine our 2026 market report alongside vessel-class comparisons in our Phu Quoc and Con Dao supply guide.

Institutional Directory of Vietnam's 15+ Active Ferry and Ro-Ro Operators

Mapping coastal carriers by tier, hull spec, and API fulfillment prevents catalog errors across the routes below.

Tier A — National Multi-Corridor Leaders (Superdong & Phu Quoc Express)

Superdong Kien Giang (HOSE: SKG) runs 16 high-speed monohulls serving 9 corridors (171–306 seats). Phu Quoc Express operates eleven ships spanning 223–598 seat twin-hull catamarans alongside its flagship 1,017-passenger Tau Thang Long monohull across 7 regional branches. Both carriers issue assigned ECO/VIP e-tickets automatically through Ferry VN.

Tier B — Corridor Specialists, Ro-Ro Fleets, and Regional Port Operators

Thanh Thoi Ro-Ro (12 vehicle ferries) and Binh An Ro-Ro (3 dual-deck ships) transport motorbikes, cars, and foot travelers into Phu Quoc over schedule/fare lookup feeds, while Greenlines-DP, Phu Quy Express, Hoa Binh Ship, Lightning 68, Chan Kha Luxury, Minh Nga, the Sa Ky Port Fleet, and Victoria Speedboat serve coastal and Mekong crossings. Inspect carrier software modules on Ferry VN's Operators page.

Operator Name Tier Fleet & Hull Profile Active Corridors (Post-July 2025) Ferry VN API Fulfillment Tier Verified Status (Nov 2026)
Superdong (HOSE: SKG) Tier A 16 monohulls (171–306 seats) RG/HT–Phu Quoc, Tran De–Con Dao, Phan Thiet–Phu Quy, RG–Nam Du/Hon Son Automated direct API e-ticketing Active across 9 routes
Phu Quoc Express Tier A 11 ships: 223–598 seat twin-hull catamarans + Tau Thang Long (1,017-pax monohull) RG/HT–Phu Quoc, Tran De/Vung Tau–Con Dao, Phan Thiet–Phu Quy, Sa Ky–Ly Son Automated direct API e-ticketing Vung Tau–Con Dao sidelined Aug 1, 2026 (exp. Jan 2027)
Thanh Thoi Ro-Ro Tier B 12 vehicle & passenger ferries Rach Gia–Phu Quoc, Ha Tien–Phu Quoc Schedule & fare lookup feed Active
Binh An Ro-Ro Tier B 3 dual-deck Ro-Ro ships Ha Tien–Phu Quoc Schedule & fare lookup feed Active
Greenlines-DP Tier B Coastal high-speed catamarans & hydrofoils Bach Dang Pier (HCMC) – Vung Tau Automated direct API e-ticketing Active
Phu Quy Express Tier B High-speed coastal passenger fleet Phan Thiet–Phu Quy, Nha Rong Khanh Hoi (HCMC)–Con Dao Automated direct API e-ticketing HCMC–Con Dao maintenance Sep 1, 2026 (exp. Jan 2027)
Hoa Binh Ship Tier B Regional high-speed passenger vessels Rach Gia – Hon Son / Nam Du Automated direct API e-ticketing Active
Lightning 68 Tier B High-speed catamarans Rach Gia – Hon Son Automated direct API e-ticketing Dropped RG–PQ Jul 28, 2026
Chan Kha Luxury Tier C High-speed island passenger vessel Phan Thiet – Phu Quy Automated direct API e-ticketing Active
Minh Nga Tier C Coastal passenger shuttle Ha Tien – Hai Tac / Tien Hai Port-assisted / schedule fulfillment Active
Sa Ky Port Fleet (An Vinh Express, Super Bien Dong, Sieu Toc Hoa Binh) Tier C Municipal coastal passenger fleet Sa Ky Port, Dong Son – Ly Son Semi-automated port-connected fulfillment Active
Victoria Speedboat Tier C Cross-border Mekong speedboats Chau Doc – Phnom Penh (Cambodia) Schedule-assisted fulfillment Active

Inspect 86 partner /api/v1/ routes on Ferry VN's API & SDK platform via zero-cost uatexpress UAT (https://api.ferryvn.net), apply through our B2B API partner portal, or compare endpoint specs in our Vietnam Ferry API and OTA sourcing guide.

2025–2026 Fleet Status Audit: Exits, Pivots, and Scheduled Suspensions

Marine diesel volatility (Superdong Q3 2026 earnings fell 96% YoY despite +9% top-line growth) accelerates route consolidation across smaller carriers:

  1. Mai Linh Express (Halted): Ended Can Tho–Con Dao sailings permanently on May 24, 2025. Remove from live search feeds.
  2. Lightning 68 (Corridor Shift): Dropped Rach Gia–Phu Quoc effective July 28, 2026 to concentrate vessels on Rach Gia–Hon Son.
  3. Phu Quoc Express & Phu Quy Express (Maintenance Windows): Phu Quoc Express sidelined Vung Tau–Con Dao starting August 1, 2026 (slated to return January 2027), while Phu Quy Express paused HCMC–Con Dao starting September 1, 2026 (targeting January 2027) while maintaining Phan Thiet–Phu Quy sailings.

Explore fuel-margin playbooks replaced by empirical yield levers in our yield software guide and global switch deficits in our GDS supply-gap analysis.

Mapping Seven Mainland Port Corridors Under Resolution 202/2025/QH15

Effective July 1, 2025, National Assembly Resolution 202/2025/QH15 (published via the Vietnam Government Portal) consolidated coastal municipal borders alongside VIMAWA under Decree 33/2025/ND-CP:

Vietnam 15+ ferry operators directory, 2025–2026 fleet audit, and 7 Resolution 202/2025/QH15 corridors ahead of APEC 2027

  • An Giang Administration: Covers Phu Quoc, Kien Hai (Nam Du, Hon Son), and Tho Chau Special Zones alongside Rach Gia Ward, Ha Tien / To Chau Ward, and Tien Hai.
  • Ho Chi Minh City Administration: Encompasses Con Dao Special Zone alongside Vung Tau Ward, Nha Rong Khanh Hoi Port (Xom Chieu Ward), and Bach Dang Pier.
  • Can Tho Administration: Includes Tran De Commune, currently the shortest mainland ferry port serving Con Dao.
  • Lam Dong Administration: Links Phan Thiet Ward with Phu Quy Special Zone.
  • Quang Ngai Administration: Pairs Dong Son Commune (Sa Ky Port) with Ly Son Special Zone.

Preserve legacy province labels solely as hidden search aliases while surfacing current jurisdictions on manifests and VAT records per our passenger manifest guide and Vietnam DMC sourcing guide.

Accessing All 15+ Operators Through One B2B Layer

Ferry VN JSC (Tax ID 1801802790) consolidates 15+ domestic carriers linking 150+ travel agencies, 13,000+ registered users, and six public marketplace channels (Klook, Viator, Trip.com, GetYourGuide, 12Go, and Tatinta) verified November 2026. Inspect commercial tiers on Ferry VN Pricing, study endpoints via the corridor directory developer docs, or contact hi@ferry.vn (+84 924 299 898).

FAQ

Frequently Asked Questions

What are Phu Quoc's latest 2026 tourism statistics ahead of APEC 2027?

Provincial figures confirm Phu Quoc logged more than 8.57 million combined air-and-sea arrivals across January–September 2026 (+30.5% YoY), with foreign entries jumping 60.2% past 1.92 million and tourism receipts nearing VND 45,976 billion.

Who are the two largest high-speed ferry operators in Vietnam by fleet size?

Superdong (HOSE: SKG) runs 16 monohulls across 9 routes (171–306 seats), while Phu Quoc Express operates eleven ships spanning 223–598 seat twin-hull catamarans alongside its 1,017-passenger Tau Thang Long monohull across 7 branches.

Which Vietnamese ferry operators exited or suspended routes in 2025–2026?

Mai Linh Express halted Can Tho–Con Dao sailings during May 2025. Lightning 68 dropped Rach Gia–Phu Quoc effective July 28, 2026 for Rach Gia–Hon Son. Phu Quoc Express sidelined Vung Tau–Con Dao starting August 1, 2026 and Phu Quy Express entered maintenance on HCMC–Con Dao on September 1, 2026, both targeting January 2027 return.

How did Resolution 202/2025/QH15 change Vietnam's island and port jurisdictions?

Since July 1, 2025, An Giang administers Phu Quoc, Kien Hai, Rach Gia, and Ha Tien, while Ho Chi Minh City encompasses Con Dao, Vung Tau, Nha Rong Khanh Hoi Port (Xom Chieu Ward), and Bach Dang Pier. Can Tho governs Tran De, Lam Dong covers Phu Quy and Phan Thiet, and Quang Ngai oversees Ly Son and Sa Ky.

Can an international OTA connect to Superdong, Phu Quoc Express, and Greenlines-DP through one API?

Yes. Ferry VN integrates 15+ Vietnamese fleets — led by Superdong, Phu Quoc Express, Greenlines-DP, Phu Quy Express, Hoa Binh Ship, and Lightning 68 — behind one B2B agreement and @ferryvn/sdk, with cost-free testing on api.ferryvn.net.

Related articles

Yield Management & Ferry Software in SEA — Ferry VN

SEA Ferry Yield & FOM Guide

Ferry booking software and yield management for Southeast Asian operators: HOSE:SKG fuel-margin proof, 5 load-factor levers, and FOM architecture benchmarks.

25/11/2026
Vietnam Maritime Ferry Market Report 2026 — Ferry VN

Vietnam Ferry Market 2026

Vietnam tourism statistics 2026 for island ferry markets: Phu Quoc 8.57M, Con Dao 612K, SKG Q3 fuel squeeze, VIMAWA Decree 33, and B2B distribution data.

25/11/2026
Intermodal Sea‑to‑Land Travel in SEA — Ferry VN

SEA Intermodal Ferry Supply

Intermodal travel across Southeast Asia island ferries: why air-to-sea and bus-to-sea OTA trips break at piers and how regional APIs and MCP unify supply.

25/11/2026